说明
knocked down flex post. please add hardened separation for the bike lane here like the amazing precast concrete curbs on Brattle Street.
knocked down flex post. please add hardened separation for the bike lane here like the amazing precast concrete curbs on Brattle Street.
7 评论s
City of Cambridge (官方验证)
Doaner (注册用户)
已确认 Traffic - JB (Engineering) (官方验证)
Traffic - JB (Engineering) (官方验证)
关闭 Traffic - JB (Engineering) (官方验证)
Hello,
We do not anticipate additional work days this year, but we have noted this location. We will plan on a replacement when maintenance resumes in the spring.
Thouis (注册用户)
Traffic - JB (Engineering) (官方验证)